Gummersbach, 23. January 2019. Kanadevia Inova Steinmüller GmbH, based in Gummersbach/Germany has been awarded a contract for the extension of the Energy from Waste plant Premnitz. The scope of supply and services includes planning and construction of the boiler including grate and ancillary equipment for a second line of the plant. The client is EEW Energy from Waste Premnitz GmbH. Commissioning is scheduled for mid-2021.
The small town of Premnitz is located in the nature park Havelland west of Berlin. Ten years ago, the EVE 1 was considered one of the most modern facilities for the energy recovery of high-calorie refuse-derived fuels in Europe. The EVE 2 is designed for a fuel mix of household waste, commercial waste and refuse derived fuel, with a throughput of 150,000 t/year and a capacity of 56 MWth. While a small proportion of energy is used for own use, most of it comes to local industrial customers and households in the form of process steam, district heating and electrical energy. In the long term, the EVE 2 is to replace a fluidized bed combustion unit with a throughput capacity of 120,000 t/year in the plant network.
Steinmüller Babcock convinced in the tender with a technical concept that combined a tailor-made solution with a good price level. For Steinmüller Babcock, the order symbolises the continuation of a very good cooperation with the EEW Group. Most recently, Steinmüller Babcock had extended the EEW plant in Delfzijl / Netherlands with a line. The EEW Group has been building and operating thermal waste recycling plants for 30 years, currently there are 18 plants in Germany and neighboring countries with a total annual recycling capacity of more than 4.7 million tonnes of waste.
Photo: Starting in 2021, the new EVE Premnitz line will recover the energy from a fuel mix of household waste, commercial waste and refuse derived fuels. © Picture: EEW Energy from Waste Premnitz GmbH